MAD documentation
Verification plan
The staged testing Rev A must pass before it is connected to an initiator or flown.
This is the plan for qualifying the prototype, not a record of completed tests. Rev A is an engineering prototype, not a certified flight-safety product.
1. Unpowered inspection
- Keep the ARM jumper (J3) open and leave the match terminal (J2) disconnected.
- Inspect polarity and orientation, and measure resistance from each rail to ground.
- Verify the firing-bank bleeder and confirm the firing MOSFET gate is pulled low.
2. Current-limited bring-up
- Use a bench supply at 3.7 V with a 100 mA limit, then raise the limit gradually.
- Confirm the 5 V and 3.3 V rails, and check that the firing bank remains discharged with J3 open.
- Connect USB and verify that USB alone cannot charge the firing bank.
- Repeat functional rail checks at 3.0 V and 18.0 V while monitoring regulator temperature and input current.
3. Logic and sensor
- Program firmware over SWD, then verify USB
STATUS,DUMPand disarmedERASE. - Rotate the board through known orientations and compare raw magnetometer data with a reference magnetometer. Characterize installed-airframe hard- and soft-iron bias.
- Verify every reset and fault path leaves the charge and fire commands low.
4. Inert firing-load test
- Use a non-inductive 1.8 Ω pulse-rated resistor and an oscilloscope. No match.
- With a guarded setup, install J3, allow charge, and record capacitor voltage, load current, pulse width and MOSFET voltage. Inspect the PCB and terminal thermally.
- Repeat at 3.0, 3.7, 9, 12 and 18 V and at temperature limits.
- Confirm that removing J3 independently blocks both charging and firing.
5. Controlled initiator test
Only after independent review and inert-load acceptance, test production-lot matches in a legally compliant remote fixture with shielding, exclusion distance and fire controls. Establish statistical margin; one successful firing is not qualification.
6. Flight qualification
Vibration, acceleration, EMI, brownout, watchdog, data-retention, thermal-cycle, airframe magnetic calibration and failure-mode testing are still required.